Client : Joint-Venture Max-Streicher & Bouchamaoui Industries
End User : OMV
Location : Tataouine, Tunisia – CPF Gas
Scope of Work
- Commissioning of the Electrical Part:
- This involves ensuring that all electrical components and systems are functioning correctly.
- It includes testing and verifying the electrical wiring, power distribution, and control systems.
- Commissioning ensures that all electrical equipment, such as transformers, switchgear, and power distribution panels, are operational and safe.
- Loop-Test of Instruments:
- Loop testing is a critical step in commissioning and involves checking the functionality of various instruments and sensors in the control and monitoring systems.
- Instruments such as pressure transmitters, temperature sensors, level indicators, and flow meters are tested to ensure they are accurately measuring and transmitting data.
- The loop test verifies that instruments are properly calibrated and integrated into the control system.