End User : SEREPT
Location : Sfax, Tunisia : Offshore on ASPF3 platform
Scope of Work:
- Equipment Supply:
- Procure and supply the required tubing (8/10 size), fittings, unions and other necessary components based on project specifications and requirements.
- Ensure that all supplied equipment meets industry standards and project quality criteria.
- Installation of Tubing Support:
- Prepare and install the necessary supports, and brackets for tubing along the specified route.
- Ensure that the tubing support system is securely mounted and capable of withstanding the operational loads.
- Installation and Fitting of Tubing (1000 meters):
- Accurately cut and bend the tubing as needed to fit the layout.
- Assemble and install the tubing over the designated 1000-meter length.
- Connect tubing segments using fittings, unions and other required components.
- Installation of Cable Trays:
- Procure and supply cable trays as per project specifications.
- Mount the cable trays in the designated locations, ensuring proper spacing, support, and alignment.
- Securely attach the trays to the structure to accommodate a section of the installed tubing.
- Commissioning and Start-up
- Perform leak tests and pressure tests to ensure the integrity of the tubing system.