Client : Perenco-ETAP
End User : SEREPT
Location : Sfax-Tunisia, Ashtart Platforms (05)

Scope of Work:

  • Preventive and Curative Maintenance of PFC and PF3 Sites.
  • Installation Activities Related to the Fire & Gas System on ASPP2 and ASPF3 Platforms:
    • Installation Planning: Detailed planning of the installation process, including the selection of equipment, cable routing, and safety considerations.
    • Equipment Installation: Mounting and connecting fire and gas system components, such as detectors, alarms, control panels, and communication devices.
    • Cable Installation: Pulling and securing cables for power and data transmission.
    • Testing and Commissioning: Ensuring that the fire and gas system is installed correctly and functions as intended, including conducting alarm tests and calibrations.
    • Documentation: Properly documenting the installation process, including “as-built” drawings and equipment manuals.
  • E&I Installation Activities:
    • Electrical Installation: Installation of electrical components, such as wiring, circuit breakers, switches, and lighting, in accordance with safety and electrical codes.
    • Instrumentation Installation: Installing various instrumentation devices, such as sensors, transmitters, and controllers, for monitoring and controlling processes.
    • Calibration: Precisely adjusting and configuring instruments to ensure accurate measurements and control.
    • Safety Checks: Ensuring that all electrical and instrumentation installations comply with safety standards and regulations.
  • Execution of Modification and Upgrading Works
  • Calibration, Functional Test, and Inspections