admin No Comments
Client : Samsung Engineering and Construction Limited
End User : GTIM – JV between SonatrachTotal & CEPSA
Location : Timimoun, Adrar, Algeria – Gas Treatment Plant : 37 wells that are linked to a gas processing facility, which in turn, ties into the GR5 pipeline. The pipeline is used for delivering gas from southwestern Algerian gas fields to Hassi R’mel.

Scope of Work:

  • Cable Pulling, Installation, and Wiring of Cabinets and Junction Boxes
  • Instruments Installation
  • Wiring of Equipment (Turbines, Compressors, Electrical Rooms, etc.)
  • Installation and Fitting of Tubing
  • Connection of ATEX Equipment, Glands, etc.
  • Pre-Commissioning, Commissioning, and Start-up of the C, E&I Installation:
  • KDE Team on Site Composed of Around 200 Engineers, Supervisors, Technicians, Fitters, and Welders.